  1. IsoShin

    Asphalt placement waiting period

    Hi, We have a deep strength pavement design, and was wondering if there are rules regarding the timing/condition in placing asphalt layers on top of each other? If we have 4 layers of asphalt including the wearing course, can this be placed, compacted and then the next player being placed...
  2. IsoShin

    Pavement Depth vs Aggregate

    Hi, 5mm is the actual allowable thickness of the pavement. Thanks,
  3. IsoShin

    Pavement Depth vs Aggregate

    Hi, Hopefully I am in the right area. Recently I received a Pavement Design with a total depth of about 600mm. There is a SAMI seal below the wearing course which asks for 10mm S25E and AMC00 prime below that. However the allowable depth is only 5mm, so I wanted to ask is it common practice...