What is the recommended practice for paralleling / transfering and splitting loads between two 132kV/11kV Transformers? The transformers are rated at 45MVA and carry loads of 15MW and 8MW in a split configuration. The transformers have a 14 tap OLTC and are normally coupled on the 132kV side...
The company is installing a lot of new transformers and switchgear at the moment. As there are hundreds of components in this equipment I am looking for a method of determining which spares should be kept on site. Can anyone offer some guidance?
I am needing to write a safety procedure for entering oil filled transformers. These are classified as confined spaces. Has anyone seen anything on this subject?