Alrite i have read through some of the other posts that were on here about peeling but i have a different situation. I work in a shop pouring concrete wall panels. We do 2.5" inch on the bottom 4" of foam and then another 2.5" on top of the foam. We pour about 30 of these panels a day. So first...