Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: nTops
  • Order by date
  1. nTops

    Intralink file overwrite, help required

    Thanks for the input. Unfortuatly we had frames disables as default. Anyway around that? It would be a great help if PTC left the checkout workspace blank, that exactly why I made the mistake. I am going to recomend to our design team to have a workspace called 0000 or somthing similar to...
  2. nTops

    Intralink file overwrite, help required

    I checked out an assembly into the wrong workspace this morning, overwriting 3 days of work (un-checked in). Is there any way to revert a workspace to the condition it was in the previous day? I can see all the files I need in the .proi directory, just can't get at them through intralink...

Part and Inventory Search