Thanks everyone for all the insights. The concrete was specified to be 2500psi (if that helps with guessing the slump). The bores did not use a casing and the cages had small concrete standoffs wired to the corners (about every 2') to keep them centered in the bore. So I don't think shaking...
We are concerned about the work a concrete company has done. We learned halfway through the project that they should have been using a vibrator during the pours. We made them use one for the retaining walls, but they had already poured all the piers. The piers are 16' deep, 16" diameter. The...