  1. Saralex

    Circular earth retention wall design methods

    Contractor is responsible for design of temporary ERS for a launching and receiving shaft for a sewer tunnel. Inside diameter 35 feet and excavation depth 42 feet. Contractor proposing a secant pile wall with 2 foot diameter auger cast piles, every other pile steel reinforced. His design...