Hi Everyone,
I am HVAC engineer and work at tropical zone (hot and Humid) and now dealing with the fire philosophy inside substation building.
Substation is separated into 3 rooms let say A, B, C.
A = Manned Area (Control Room)
B,C = Unmanned Area (Panel Room)
Each room is provided their own...
Hi Everyone,
I am HVAC engineer and work at tropical zone (hot and Humid) and now dealing with the fire philosophy inside substation building.
Substation is separated into 3 rooms let say A, B, C.
A = Manned Area (Control Room)
B,C = Unmanned Area (Panel Room)
Each room is provided their own...
Thanks you all guys. I am weighing your all suggestion and integrating the finding the optimum one. Cause i have not much choice from client buy convincing them at best.
Moideen,
The existing system is not sized correctly (a huge margin is added). my Client need my service. then, they okay with only one adding Duct heater to simulate the load and let the compressor continue its doing.
Hi,
I need some advice regarding the humidity control.
...Outdoor Condition 95 F and 60%RH and Indoor 74 F 50%RH.
Our existing substation & Control Room is located in Tropical Zone (Thailand). My Client is facing the problem the exceeding in Relative Humidity in room cause the panel surface...