Thanks dgillette,
It's possible that they weren't saturated on the north side, but what I find strange is that the upper piezos went in sequence to capture the lower piezos reading. Judging from the behaviour of the settlement gauges, and the instrumentation on the opposite side of the railway...
Hi all,
We've been working on a bridge construction project since 2004, in which a road bridge over a main railway line and a secondary spur line required some very in-depth analysis when it was discovered that a 100+ year-old sewer (combination of soil supported brick arch and pile supported...