Dear everyone
is there any procedure to make the necessary cost estimation for a fixed roof storage tank which must be fabricated according to API 650.
what we need is an approximate values for:
1- foundation
2- erection and construction
3- how many tons of carbon steel plates needed taking...
thanx for your kind reply , still i need a clear confirmation to decide whether this plate is 283 gr. c or not moreover i need to know how you can match these tests results with gr. A or B or C, what is the parameter which make you decide?
we did the following steel plate inspection ( 8 mm thk.) according to ASTM E 415-17 , we got the following result
C% 0.172 SI% 0.151 Mn% 0.702 P% 0.0122 S% 0.0033 Cr% 0.0210 Mo% less than 0.002 Ni% 0.023 Al% 0.0363 Cu% 0.0081 Fe% Bal
ultimate stress (Rm) N/square millimeter: 494
YS (RE)N/square...
we did the following steel plate inspection ( 8 mm thk.) according to ASTM E 415-17 , we got the following result
C% 0.172 SI% 0.151 Mn% 0.702 P% 0.0122 S% 0.0033 Cr% 0.0210 Mo% less than 0.002 Ni% 0.023 Al% 0.0363 Cu% 0.0081 Fe% Bal
ultimate stress (Rm) N/square millimeter...
Dear sirs
hi, our project is to supply a missing prefabricated carbon steel shell plates , the grade of the material is ASTM 537 Cl1 with 19 mm thickness , all these prefabricated steel plates are inculding manholes of 24 , 36 inch falnges , of course these flanges are connected to the shell...