I may have left out some important data.
Duty cycle is roughly 6 seconds, 5 seconds forward and 1 sec return.
# of duty cycles posible per hour is 200 to 300.
rest time between duty 5 to 20 seconds.
possible # duty cycles per month 50,000 to 100,000
I am thinking of using Gear Track to transport a trolley in conjunction with Steel Tubing. I have had experience with large applications but the scale I am working with is much smaller.
The distance of travel is 6'.
the size of the tubing can be 0.5 to 1" O.D.
Duration of forward travel 5...