Thanx for your feedback. when I said operators I was referring to the Lathe and Deck operators. These are the people in charge of the core production, because we peel fiber logs to produce veneer (raw material for plywood) and the by products from this process are cores. My project is centered...
I am a recent IE grad. I have been asked to lead a project that involves increasing the core recovery in our veneer production process. I identified the drastic reduction in our process and as a result I was assigned to spearhead the project. first, I have determined the root cause and it seems...
I need some advice in conducting time studies in a manufacturing environment. I am a recent graduate with an entry level position. can anyone suggest some methods or books I can look up for support and referral. Thanks