I am making a steam header(12mm thick 12BarG operating pressure) from rolled plates A516 gr.70 and plan to weld all the joints using GMAW process with CO2 shielding gas. Can anyone give input if there will/may be a problem on the welding when the header is put on service.
iskandar13
I am designing a dust collecting system to be installed after a fluidized bed coal fired boiler. Can anyone help me where can I get references on the system?