I have a conveyor calculation problem.
My con' travels at 38 metres/min, this is loaded with boxes 100mm in length at the rate of 20 boxes a minute. I have to build up 195 of these boxes which butt up against each other before the conveyor release's, how do i work out how long that will take ?