Hi everyone, I work in a pump company in Italy.
A client now ask for a verification of a pump assembly ( motor + pump+ baseplate) as per UBC zone 1.
I don't know how to deal with it.
wich are the rules for the verification, if there si a classment of implants that prevent from a whole...
sorry I did not answered before, yes I need to be more specific.
So, I'm working for a pump facility, and I need to determine the preload on bolts on the flanges between pipeline and the pump, and even the bolt assuring the cover to the pump for a variety of pressure and a variety of diameters...
Hi everyone i'm new here.
A courtesy, i need to calculate the preload on the bolts connecting the pump to his cover and to pinping.
Do you any code that would help me? or if you have any formula.
Thx
Bye