Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. orceng

    Water Quality Flow Calulations

    A jurisidiction requirement for water quality treatment is "0.5 in of post developed runoff from each storm". How would you go about determining flow rate from that to use to size a conveyance ditch? They also say to "provide a minimum water quality treatment rate of 0.05 inches per minute"...
  2. orceng

    Water Quality Treatment in Raodside Swales

    For water quality treatment in roadside swales in highway design, the normal residence time in the swale is 9 minutes to get full treatment. You will have portions of the runoff from the highway that will hit the swale at the downstream reaches and will not meet the 9mins before discharging...

Part and Inventory Search