Hello everyone,
I have attached a rating curve which i developed from HECRAS and Excel for a lateral structure (spillway) which drains into a culvert, the crest elevation of spillway is 333 meter and that of the roadway is 335 m.
I took a C value of 1.44 (SI) assuming the spillway as broad...