Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. bdavila

    Water tight pipe joints for significant hazard dam

    For a significant hazard dam which has a 36" RCP meeting ASTM C-361 the contractor had already placed a concrete cradle which came up to the springline of the pipe before I discovered that there were a couple of joints that were not within the allowable tolerance for joint seperation. The two...
  2. bdavila

    Stage Storage for a horizontal sloped pipe

    Bimr, Thanks for the lead but I had tried the link to ADS in the other forum and it no longer works.
  3. bdavila

    Stage Storage for a horizontal sloped pipe

    Stage - storage calculations are required for stormwater management volumes. As the pipe fills up there is a loss in volume if the horizontal pipe is sloped. In my case I have a 10' dia pipe so my stage elevations would be in one foot intervals. I need the storage for each of the stage elevations.
  4. bdavila

    Stage Storage for a horizontal sloped pipe

    Does anyone know of link to a free website that has a user friendly program or spreadsheet to compute the stage storage for a horizontal sloped pipe? Thanks

Part and Inventory Search