One of the left embankment PZs response versus time.
http://files.engineering.com/getfile.aspx?folder=e6b50a8d-558e-4990-a055-55f241bdd501&file=PZ,_Pool.jpg
For your consideration and input. I am performing an evaluation for a dam which utilizes a concrete gravity spillway structure with monoliths placed on firm bedrock. The right embankment has an impervious core with adequate transitioning zones into rolled rockfill, adjacent to the impervious...
Mike,
Thanks for the comment. Your correct, the data has been thoroughly reviewed and analyzed and the evaluation and conclusions are nearing completion. My goal is to elicit your initial response as to what could be going on keeping in mind I am not asking for an in depth analysis. I'm...
For your consideration and input. I am performing an evaluation for a dam which utilizes a concrete gravity spillway structure with monoliths placed on firm bedrock, an installed double line grout curtain to control seepage and relief drains to collect the seepage that passes through the grout...