Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. TSMBK06

    Piping Arrangement of Plate & Frame for Water Side Economizer

    I am struggling with whether to pipe a plate and frame (150 ton) in series or parallel with two 400 ton chillers for water-side (w-s) economizer cycle. The questions is approach off of the tower and supply water temperature to be supplied during w-s economizer operations. The conditions are...

Part and Inventory Search