Dear All,
I am newbie in engineering
I was presented with new task ; adding to silo 2" #150 nozzle(1). Design P&T - 0.05barg/100Celsius.
I am unfamiliar with the process and would like to know the correct procedure to do this.
Nozzle will be use as sample collecting.
Can i use existing...