There is a disagreement between engineering and fabricators whether the piping to the economizer needs to be fabricated according to Section 1 or just plain piping code B31. Can someone please inform me if the piping to the economizer must meet Section 1? And if yes, what paragraph?
P.S...
Does any one know if the rated Deaerator system has to exceed the max capacity of the boiler system?
We are trying to determine if the Deaerator system has to be revamped to accomodate a new and larger boiler that will replace an existing one. A couple points regarding safety (Deaerator...