  1. mickeks

    Cables generating KVARs in ETAP

    Hi Everybody, I am having a problem in ETAP. I have solar power plant connected to 220kV network via 10km cable. Now, I entered physical parameters of the cable in ETAP library and let it calculate electrical parameters. After that I started low flow with the assumption that there are no power...