  1. deckie1026

    Pressure relief device requiements for two pressure vessel in the same

    Section VIII Div 1 question: Is it permissable to have a single pressure relief device for two pressure vessels in the same system ? Pressure relief device and piping are sized with the corect capacity to provide required over pressure protection.
  2. deckie1026

    Pressure part inspection companies - Asia

    ABS Consulting has representation in the countries you mentioned. ABSConsulting.com
  3. deckie1026

    Making Two Vessels From One - Code Issues?

    metengr;I certainly appreciate your comments.If I were involved in this project, I would hire a reputable R stamp certificate holder. If I were the AI, I would require a PMI to be conducted as well as UT thickness gaugings. I would require calculations to be produced in accordance with the ASME...
  4. deckie1026

    Making Two Vessels From One - Code Issues?

    DECODE, I would agree with you if this was new construction activity but this is not new construction in my opinion. This activity is post construction and the NBIC is the Code that is applicable.There is nothing in the NBIC that I can find that would specifically prohibit this situation. This...
  5. deckie1026

    Making Two Vessels From One - Code Issues?

    The ASME Code symbol "U" stamp can only be used once at the time of new construction. An NB R stamp holder may issue R-2's for these vessels with the concurence of the AIA.The original ASME "U" stamped data plate may remain on one vessel.
  6. deckie1026

    air receiver corrosion allowance ASME VIII Div 1

    Is there a minimum corrosion allownce for air receivers in ASME Section VIII Div 1 ? I can not locate this requirement.
  7. deckie1026

    Looking for ASME PV Inspector in Mexico

    absconsulting.com has significant presence in Mexico
  8. deckie1026

    Any new Div 2 discussion paper?

    The ASME Boiler and PV committees met this week in New Orleans at the Sheraton hotel on Canal street. A presentation was given on Sunday pm concerning the Div 2 rewrite. You can get a copy of the presentation by contacting the ASME office at the hotel today or ASME NY office next week.
  9. deckie1026

    ASME Code Sect VIII Div 1 Hydrostatic Test Hold Time

    ASME does not specifically address the hold time duration. The hydro hold time is quite often a customer requirement.
  10. deckie1026

    ASME Section VIII Div 2, 2007 Edition

    Will the 2007 Edition still require an RPE for the MDR ? I have heard rumors to the contrary.
  11. deckie1026

    API 4F auditor

    Where can I find a competent API 4F auditor for an offshore/marine application ?
  12. deckie1026

    ASME VIII Div 2 question re AF 402

    AF-402 3rd sentence states"The exemptions for post weld heat treatment in Tables AF-402.1 and 402.2 are not permitted when the vessel is designed for lethal service. (AG-01.1(c)...." However, the Notes of Table AF-402.1 for P1 material (2)(b)1,2,3,4, list conditions where heat treatment is NOT...
  13. deckie1026

    hydrogen disbonding

    Operating pressure is 150 bar. My concern is the design temperature although 104 C is not high temperature. Does anyone have experience with disbondment in this temperature range ?
  14. deckie1026

    hydrogen disbonding

    cladding is 6 mm.
  15. deckie1026

    hydrogen disbonding

    Clarification. The cladding is ESW process.
  16. deckie1026

    hydrogen disbonding

    We have a vessel with shell material SA 765 Gr II clad with inconel alloy 625. Design temperature is 104 C. We will fit a non load bearing internal( alloy 825 ) to the shell. We plan to fillet weld (ESW process) the internal directly to the cladding. Vessel is in sour gas service. Is hydrogen...