This is probably a much smaller, simpler application than you are accustomed to. The supply voltage is 120/208 and the main breaker is 100A. One of the loads is a 3-phase air conditioner that draws 46A steady state and 239A locked rotor.
The breakers are...
I'm accustomed to spec'ing circuit breakers so that the downstream breakers have a shorter delay than the upstream (main) breakers.
But what do I do when I have a load with a high inrush current? I pretty much have to use a breaker with the longest available delay for that load, so I won't be...