  1. ThePVFabricator

    spwht on on 9cr material?

    is spwht required by section VIII for 9cr material and if so is impacts required to be done after spwht is performed on the sample.
  2. ThePVFabricator

    in need of sa-516-60 allowables from 1973 code....Does anyone have this?

    I need to know the allowable for that code year.
  3. ThePVFabricator

    post pwht weld repair on SA-387-11 per section VIII -1

    PQR was run for 5 cycles. We ended up just doing a full band local. Thanks
  4. ThePVFabricator

    post pwht weld repair on SA-387-11 per section VIII -1

    Yeah, that is what I found. I searched every spec concerning repair and PWHT under different P groups and could only find allowance for pipe and tubing 4" and less with wall thickness of .625 for P4 material. I figured I'd ask to see if I missed something. Thanks.
  5. ThePVFabricator

    post pwht weld repair on SA-387-11 per section VIII -1

    Under any condition is it permissible to make a repair to a sa-387-11 weld after PWHT and not have to re-PWHT per code.