Thank you very much John:
We´re working on a pumping/storage feasibility study and have no experience in such endeavor. It´s necessary to move 270,000 gpm a height of 1050ft with steel pipes 7,300ft long. We think it´d be necessary to split the flow in two pipes using pumps capable of moving...