    BPVC CODE X-RAY/SHEAR WAVE AFTER STRESS

    Section 8 Div 2 Boiler vessel Material is F-11, P-4, 2.75" wall thickness nozzle to shell
  2. aakall123

    BPVC CODE X-RAY/SHEAR WAVE AFTER STRESS

    Can anyone tell me what paragraph in the code states that x-ray or UT must be performed after stress relieving of the weld? I know all about why doing it before and after is beneficial so I don't need a lesson on Hydrogen trapping or stresses, I need to know where exactly in the code it calls...