It is a pitless type. The floor is not that rough, and the 1" shim they are using won't make it level. It won't make up for differences across the base plate (18" wide), and I just think it is a poor way to do it.
I hadn't even thought about the fact that the cost would probably be...
I am working at a facility where they are installing two post automotive hoists (as in a garage). The concrete floor isn't level, and they are trying to level the base plates of the two posts for each hoist. They are cutting 1" thick steel "shim plates", and using those to try...
I am working at a facility where they are installing two post automotive hoists (as in a garage). The concrete floor isn't level, and they are trying to level the base plates of the two posts for each hoist. They are cutting 1" thick steel "shim plates", and using those to try...