In 10"x Sch 40 5D Pipe bends (Material SA 403 Type 304L ) if flaring is observed at end portions is it acceptable? what is acceptable criteria for flaring?
I have a question related to Section IX.
If a WPS is qualified in 1G position (Process SMAW ) , No impact test requirement.
A WPQ can be done in 3G position or other position like 2G, 2F on the basis of this qualified WPS? or it is required to carry out PQR in these positions before WPQ...