Hi GenB,
Thanks for your view. The shop manufacturer is the one who designed and will provide the relief valves.
The boiler is finished at shop, and then delivered to the site. In site, the field installer only erected it and installed the external piping.
In that case, isn't shop manufacturer...
Dear All,
I'm a novice in boiler and have a problem with ASME Sect I master data report.
In ASME Sect I, Form P-3 (Manufacturer's Data Report for Watertube Boilers, Superheaters, Waterwalls, and Economizers) there is two options to be checked, whether it's master data report (yes) or not.
We...