    Flooding the Evaporater

    i have trimmed down the flow rate to designed spec and found that there is a KW drop, as well as a more rapid cooling effect to the chw system b/iue have a psi drop from the trimming but i slowly goes back up as i satisfy the air-handlers and shut off then allowing me to shut down addtional chw...
  2. Hopeless1

    Flooding the Evaporater

    its a 30yr old design. so then the over flow really doesnt matter in it all? i just have a problem in my head with running 5800gpm CHW threw a chiller designed for 3500gpm CHW. (2000T chiller) maybe its just me?
  3. Hopeless1

    Flooding the Evaporater

    the sysetem: Primary loop; 5 chillers : 500T, 1000T, 2000T, 2500T, 3000T none are Veriable speed; it's a Manually operated plant. As a contracted comapany, we don't own anything just operate, that said we are paid by the ton and credit back KW used at EoM. here is were things get tricky the...
  4. Hopeless1

    Flooding the Evaporater

    I work in a energy plant that supplies a larger complex of building, and sence i have been here i have been in an on going arguement about CHW flow rate threw the chillers. I say that the designed flow rate would give the best performance and make the most money for our company by minimizing the...