At our facility, we actually require that all equipment be tested with a contact voltage meter after it has been de-energized and LOTO Devices installed. This is to verify its zero potential state prior to releasing it for work. In order to perform the latter task safely, the personnel are...
thread238-343771
This a response to a previous thread started by user: alehman (Electrical)(OP)on the topic of finding an easier way to create transformer arc flash labels in SKM that reports that highest shock hazard and respective limited/restricted boundaries. I'm not sure if he ever...