Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. manos90

    ABAQUS. Convergence problem:error-time increment too small- JOINTED ROCK MASS STABILITY

    Dear all, I am trying to examine the stability of a jointed rock mass. I use 3 steps: first step is GEOSTATIC, second step is static and the third is also static where i define gravity loading: *STEP,UNSYMM=yes, NLGEOM=YES,INC=10000000 *STATIC .1,1.,,.1 *CONTROLS,ANALYSIS=DISCONTINUOUS...

Part and Inventory Search