  1. ReTube

    ASME IX QW-288.1 says "A change in

    ASME IX QW-288.1 says "A change in the weld joint configuration (beyond the manufacturing tolerance) such as the addition or deletion of preplaced filler metal, an increase in the depth of the groove, a decrease in the groove angle, or a change in the groove type." Please help me to understand...
  2. ReTube

    limit allowed

    Thank you very much metengr.
  3. ReTube

    limit allowed

    Sorry Friends, I had a small accident thats why I couldnt log on for couple of days. First of all Thank you very much Chicopee & Metengr for you valueable replies. Chicope, can I please have a refrence or source of your statement above. Thanks in advance. Metengr, You are right its not a new...
  4. ReTube

    limit allowed

    1- According to ASME VIII, is there any limit of weld build up ? 2- Is it allowed by ASME VIII that a vessel can have weld build on all over its internal section due to re-storation of wall thickness ?
  5. ReTube

    Equivalent of SA 335 Gr.P1

    Hi, will somebody please let me know what Equivalent or Alternate material of SA 335 Gr.P1, I need Equivalent = BS/EN Equivalent = DIN Alternate within ASME. ( Thanks in advance )
  6. ReTube

    PWHT of test coupon

    Hi, If the plate,or forging material is ordered with PWHT simulation according UCS-85, how does it needs to be done i mean, 1- is supplier have to apply the PWHT parameters directly on material test coupon with out any welding involved ? 2- or supplier must perform some welding first on the test...
  7. ReTube

    UW-42

    Yes I did but that does not answer the question I have asked. UW-42 pqr should qualify for deposited weld metal thickness only so for example according to QW-202.3 if I have to deposit 8mm thickness of weld metal why I could not qualify on a 8mm base metal thickness. Why do I have to qualify the...
  8. ReTube

    what would be the base metal qualification criteria in this case

    In ASME VIII Div.1 It says in UW-42 that a butt welding procedure qualification in accordance with provision of section IX shall be perform for the thickness of weld metal deposited, prior to production welding. We got a situation where we are going to perfrom a weld build up on a flange SA 350...
  9. ReTube

    UW-42

    In ASME VIII Div.1 It says in UW-42 that a butt welding procedure qualification in accordance with provision of section IX shall be perform for the thickness of weld metal deposited, prior to production welding. We got a situation where we are going to perfrom a weld build up on a flange SA 350...