Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. grantak

    Bottom Blowdown - Required Flow

    My experience with the boilers I service is that most of them discharge steam from the blowdown tank during bottom blowdown. The theory is that the initial rush of water will be subcooled by the cold water in the blowdon tank (Steam must be cooled before discharging into the sewer). This water...
  2. grantak

    Hydrostatic test

    I was always taught, and in turn dictatate to all my people, there are no stupid questions, only stupid answers. I understood this to be a professional forum.
  3. grantak

    Probe type low water cut off

    I have had the same problem on a number of bolers and found that the soldered joint between the female spade connector and the stainless steel probe had become highly resistive. A simple solution is too remove the spade terminal and file the solder off the probe end back to the stainless. Then...

Part and Inventory Search