Hello fellow engineers,
We are working in a vegetable oil refinery plant. There is a task to convert our pressure leaf filters (PLF) in bleaching process to continuous process. To this day, when we want to cahnge from PLF-1 to PLF-2 we need to wait 10 minutes for filling PLF-2, additional 30...
We use the same line to pump two different fluids. The length of the pipe is 105 meters, while the diameter of the pipe is 20cm. After finishing the pumping of the first fluid, we dont want the second fluid to mix with the previous one. (Due to the price and quality differences). My point was...
Hi. I would like to know how to discharge the leftover fluid in the pipe after pumping completed. After tank is fully loaded, the pump is automatically turned off. Thus, the fluid in the pipe stays there after pump stop. Is there any way to discharge the leftover fluid from the pipe?