Thanks GroovyGuy,
Your right, I oversimplified my statement a little and there are zones 1 and 2 around evacuation pipework and vents. I guess I was just trying to work out if the Hazadous Area Dossier is tied to the Hazadous gas, or the electrical installation. ie Do I need the Dossier if...
Hi Guys,
I am managing a project were we are using an electrolysis to produce chlorine for water dosing, with H2 byproduct. Hazardous area classification is completed and we've ensured that no electrical equipment is installed in the classified zones. My question is if there is no electrical...
Hi guys,
I have a new installation with a large number of digital tenancy energy meters that are accumulating both Import and Export kWh. Units are not yet occupied and load should be zero, apart from some control circuits on Hot water etc. These are apartment units with no generation...