I just recently ran into a problem I had not considered before:
I am working on specifying a PSV for a new ~3000ft 8" 900# steam line. The MAWP of the line is 1108psig. The line is supplied by a steam system operating at 1500 psig (via a let down FV), and feeds a system with a MAWP of 990...