When planning the development field, in forecasting and simulations phase, analyzing the predicted curves and aiming to improve the production. What analyses can I make to make shure that it is necessary to add a pump or a separator?
Hello everyone, I would like to know the technical requirements used to phasing a exploration and production subsea project.
Which criteria to analyze to add, after start the first oil production, a separator, booster, compressor and so on?
Is it the water cut, decline curve?