Here is the problem (NEC 2012):
Generator normally operates in parallel with the power grid. Grid is at 12.47 kV with a wye-wye transformer going down to 480V.
The customer owns the transformer.
The original design had the N & G bonded at the wye wye transformer, the 480V breaker, and at the...