Hi Ingenuity,
Understood. So, the rams are to pre-load the wedge, not the strand. Pre-seating the wedge to reduce impact loading before severing tendon.
Thank you so much for patiently describing your method.
May I ask where are you currently practicing structural engineering?
I'm a...
Hi Ingenuity,
Thanks for the detailed explanation.
The intent is by stressing the ram on each side to about 15-16 kips, we pretty much end up without any pre-tension in the zone between point A and B right? Then cutting the strand at L/2 would not result in any sort of energy release. My...
Thank you Ingenuity.
Sorry I was light on describing the conventional method, which absolutely involves careful scanning to locate the tendons, reinforcing and anchorage zones.
I currently don't have this issue. However, going into CA for some new construction projects, I'd like to have a few...
The conventional method is to chip concrete, cut tendon, and then install new anchors, grout new anchor pockets and re-tension.
I'm wondering if there's an easier way. Anyone had success using this anchor troubleshooting device?
http://www.gti-usa.net/GTI-Trouble-Shooting-Anchor.shtml
Thanks,