Yes we want to warm it up a bit by using the PBU and let it back to ISO tank, and let the circulation of LNG running until the pressure reach 7 barg.
So, do you think it would achieve the target pressure?
HI,
We want to raise the pressure of Liquefied Natural Gas (LNG) ISO tank from 1.5 barg to 7 barg, Does it possible to use Pressure Built Up Unit (PBU) which installed in closed circuit (ISO tank > PBU >ISO tank) to reach the target pressure of LNG inside the ISO Tank?
The Capacity of ISO tank...