  1. sosata

    EARTH FAULT RELAY OPERATION FOR JUMPER OPENING

    Jghrist, The non-broken line currents are 120-degree apart, because both sides of the line are earthed by neutral circuit: one side by the primary of the YY transformer, and on another side, even if there is a Delta winding, the neutral circuit is provided by a high-Z star load or (usually) the...
  2. sosata

    EARTH FAULT RELAY OPERATION FOR JUMPER OPENING

    Dear Appuni, When one phase in 66kv line is opened, an unballancy occures in your system currents. In this situation you have only 2 phase currents (in your 66kv line) that make a 120 degrees angle. This causes a big neutral current (that is equal to the sum of current vectors) in the neutral...