Maybe I should clarify a bit more. The material is probably more a sandy loam. It is sitting in a couple stockpiles located around the project.My costs would be to load, haul, and spread it to the 8" finished depth.As the owner will pay by truck cubic yard I am trying to figure a rate to apply.I...
I am currently putting together a proposal for an owner that is specifying payment of un-screened topsoil 8" thick by truck loads.The material will be hauled in 30 ton off-road trucks(I am allowing 20 CY per load estimated),dumped in a pile,spread, and walked in by a dozer.The areas to be...
I have three words for this. Drainage, drainage, drainage.It is important that a storm or heavy rainfall event does not perch on the playing surface but is allowed to seep away quickly so the field is usable as soon as possible. Here in the Northwest we build soccer fields almost as if they are...