Hello everyone.
I've got problem with my abaqus model of instalation reinforced concrete pile in ground.
I've tried a lot of options but there is still the same problem- Pile goes down about 2 meters (have to 10 meters) and then he stops.
I've checked units, mesh, bc's and it's still does not...