  1. djb65

    Open delta wild leg fault scenario

    I have two transformers connected in an open delta configuration providing 120/240V loads. The two transformers are 50kVa and 25kVA with the 50kVA center tapped. I recently experienced some significant damage to my 3 phase panel. Turns out that the neutral and one of the phase conductors...