  1. dave5599

    Allowable Wall Thickness in Process Piping

    The straight answer is API 570 (PIPING INSPECTION CODE—INSPECTION, REPAIR, ALTERATION, AND RERATING OF IN-SERVICE PIPING SYSTEMS)I am attaching an extract from the same code...Hope it will be...
  2. dave5599

    Leakage from Urea Reactor Nozzle

    Thank you ak1965 for explaining and sorry for repeating my question. (i repeated the question by mistake) Anyhow I had asked the question because we used to install C.S pipe scaffolding during inspection work in reactor, but no welding job has been performed uptill now ( after 11 years of its...
  3. dave5599

    Leakage from Urea Reactor Nozzle

    Dear ak1965, You have mentioned that things with ferritic content should not be taken inside the reactor. What is the possible damage due to ferrite to urea reactor???
  4. dave5599

    Leakage from Urea Reactor Nozzle

    Dear ak1965, You have mentioned that things with ferritic content should not be taken inside the reactor. What is the possible damage due to ferrite to urea reactor???