  1. tbvn

    Scale Problem

    Dear all, I am facing with serious problem with Scale deposit in production flowline( see attached file) and not sure how to solve this problem. We all know that if scale deposit in flow line then it will effect to flow assurance or later on can block flowline.I also took water sample for...
  2. tbvn

    Shutdown philosophy for well testing

    That meant the well will flow into production manifold and the well will not be shut in. Thanks for your help
  3. tbvn

    Pipe line design

    Dear Zdas04 and Biginch, I just got some more information and need your help. Our riser is 16” and WT is 25,4mm and the pipe line is 16” and wt 10,3mm.We are choosing the scraper pig for pigging this pipe line,do you have any document or standard to explain the selection of pigging? Thanks,
  4. tbvn

    Pipe line design

    All, Mr Biginch is correct, I am in Jakarta indonesia now. We are approaching company's file now ,so will collect more information in this. Will get back to you soon. Thanks.
  5. tbvn

    Shutdown philosophy for well testing

    Gents, Our philosophy for existing facilities when the Test separator is shutdown (USD) by PSHH/PSLL/LSLL then the well was flowing into it will auto shut in( close all Xtree valves)and both SDVs at test and production manifold closed, we think this is normal philosophy for all WHP, However as...
  6. tbvn

    Pipe line design

    Dear David, Thanks for your advise,the problem here is I have not found the company's file yet. Could you please provide some more information for this issue? Thanks,
  7. tbvn

    Pipe line design

    Gents, Our team is taking over one platform which is under detailed engineering phase,there is an issue that we are facing with, and I need some your advise for this issue: Previously our design for pipe line is suitable with riser 16" wt 25.4 API 5L X60 and MAWP is 238 bar ,however we are...
  8. tbvn

    Heater for flare scr

    All, Is there any requirements for installation of a heater in the condensate flare scrubber. Thanks
  9. tbvn

    Dewatering gas lift pipe line

    Thanks all for your advise. I got solution now. BR, tbvn
  10. tbvn

    Dewatering gas lift pipe line

    Sorry all for this question. I am a brand new in this area and I am trying to learn from you all as much as possible. Actualy we are preparing dewatering gas lift pipe line from Subsea tie in point to our facility.After we have complted hydrotest this pipe line, there is apr 360m3 water left...
  11. tbvn

    Dewatering gas lift pipe line

    Hi all, I am looking for a procedure of dewatering gas lift pipe line.Can some one help me on this issue. Best regards tbvn