Hello,
We are manufacturing the products for API-17D (Mud line suspension system)with monogram,our products are having ACME threads with various diameters. For most of the threads (ACME) we are not having the production gauges ,currently we are checking with Template,Soft gauges,3 -wire methods...
Dear All,
I had a closed die forging for which UT was done as per the SA-388 & accepted as per the ASME section VIII div 2 cl3.3.4 .
when i want to offer the same to client,my client was rejecting the same since his acceptance norms are as per the ASME B16.34
kindly through some light on...
Kindly help,
I had this problem,
one of our customers requires SA 335 Gr.91 (271.5*6.35) pipe ,but we had no supply of the pipes for the thickness of 6.35 mm.Actually We had pipe 271.5*25.2. we have planned to bore the id and get the required thickness of 6.35 mm.Our customer is asking for the...