    Tension Reinforcing in Auger Cast Piles

    EZBuilding, I know what tables you are referencing for service level loads, but where does it say that I have to check both strength and service design for a pile? Especially if I have high lateral loads I would want to design the pile and reinforcing for strength level design, correct...
  2. dirtStruct

    Tension Reinforcing in Auger Cast Piles

    Thanks all, this was very helpful! The pile is 75 feet long and the center bar we are specifying is 1 3/4" dia, but we have plenty of length to develop it.
  3. dirtStruct

    Tension Reinforcing in Auger Cast Piles

    Thanks KootK. So, really just checking the capacity for T=As(0.9fy) should suffice? Is there anything else I am missing that I should be considering for tension?
  4. dirtStruct

    Tension Reinforcing in Auger Cast Piles

    We are using auger cast piles for a project and I have some very high tensile loads I need to resist. We have the loads per the geotechnical engineer that the piles can handle, but we need to design the pile itself to take the load and transfer the force to the soil. We plan on using 120ksi...